Lions Gate Bridge Rope

Usha Martin supplied bridge ropes to Vancouver, Canada for installation at Lion’s Gate bridge, which is also designated as National Historic Site of Canada. The total length of the bridge is 1,823 metres, the length including approach spans is 1,517.3 m, the main span alone is 473 m the tower height is 111 m . The traffic volume on the bridge is 60,000 – 70,000 vehicles per day.

Following the belief that quality can only be achieved after understanding the requirements at micro level, Usha Martin carried out a thorough technical analysis of the requirement. A team of Usha Martin made observations and collected technical data about the bridge. The physical observations and the technical data were then simulated together at the micro level to identify the necessary technical specifications that would best serve the requirement. After thorough research and study, Usha Martin manufactured and supplied 44mm 7/19 Galvanised Class C type wire rope.

Disclaimer: The information contained in this website is for general information purposes only. The information is provided by Usha Martin Limited and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained in the website for any purpose. Any reliance placed on such information is therefore strictly at user's risk.
In no event shall Usha Martin Limited be liable for any loss or damage including, without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Website designed by UX Design Labs